{"id":987521578,"date":"2023-10-06T13:21:16","date_gmt":"2023-10-06T11:21:16","guid":{"rendered":"https:\/\/www.asp-equipment.de\/?p=987521578"},"modified":"2023-10-06T13:24:36","modified_gmt":"2023-10-06T11:24:36","slug":"plato-project-another-successful-milestone","status":"publish","type":"post","link":"https:\/\/www.asp-equipment.de\/en\/plato-project-another-successful-milestone\/","title":{"rendered":"PLATO Project: Another Successful Milestone"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.21.2&#8243; _module_preset=&#8221;default&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p style=\"text-align: justify;\">On September 28, 2023, ASP Equipment GmbH (ASP) achieved another important milestone in the PLATO project. The joint Delivery Review Board (DRB) for the so-called Protoflight Models of the Ancillary Electronic Unit (AEU) was successfully completed with the customer ESA.<\/p>\n<p style=\"text-align: justify;\">In this context, ESA extended its thanks to the entire AEU team (ASP and its subcontractor EVOLEO) and congratulated them on the successful DRB: The AEU team has done an outstanding job in the face of numerous challenges, especially delays caused by supply chain difficulties.<\/p>\n<p style=\"text-align: justify;\">The AEU designed, built, and tested by ASP provides power for two different types of high-precision cameras and consists of multiple power supply modules, 2 command and control modules, and an internal supply module.<\/p>\n<p style=\"text-align: justify;\">PLATO (PLAnetary Transits and Oscillation of stars) is an ESA project for the exploration of extrasolar planets. The spacecraft is equipped with 26 cameras and is set to launch into space in 2026 as part of the medium-class missions of the Cosmic Vision program. It will scan a large portion of the sky for 6 years.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On September 28, 2023, ASP Equipment GmbH (ASP) achieved another important milestone in the PLATO project. The joint Delivery Review Board (DRB) for the so-called Protoflight Models of the Ancillary Electronic Unit (AEU) was successfully completed with the customer ESA. In this context, ESA extended its thanks to the entire AEU team (ASP and its subcontractor EVOLEO) and congratulated them on the successful DRB: The AEU team has done an outstanding job in the face of numerous challenges, especially delays caused by supply chain difficulties. The AEU designed, built, and tested by ASP provides power for two different types of high-precision cameras and consists of multiple power supply modules, 2 command and control modules, and an internal supply module. PLATO (PLAnetary Transits and Oscillation of stars) is an ESA project for the exploration of extrasolar planets. The spacecraft is equipped with 26 cameras and is set to launch into space in 2026 as part of the medium-class missions of the Cosmic Vision program. It will scan a large portion of the sky for 6 years.<\/p>\n","protected":false},"author":9,"featured_media":987521580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<p>[et_pb_section fb_built=\"1\" admin_label=\"section\" _builder_version=\"4.16\" global_colors_info=\"{}\" theme_builder_area=\"post_content\"][et_pb_row admin_label=\"row\" _builder_version=\"4.16\" background_size=\"initial\" background_position=\"top_left\" background_repeat=\"repeat\" global_colors_info=\"{}\" theme_builder_area=\"post_content\"][et_pb_column type=\"4_4\" _builder_version=\"4.16\" custom_padding=\"|||\" global_colors_info=\"{}\" custom_padding__hover=\"|||\" theme_builder_area=\"post_content\"][et_pb_text _builder_version=\"4.21.0\" _module_preset=\"default\" hover_enabled=\"0\" global_colors_info=\"{}\" theme_builder_area=\"post_content\" sticky_enabled=\"0\"]<\/p><p>Seit 2007 bietet das Gymnasium des Bildungszentrums in Markdorf eine Arbeitsgemeinschaft zum Thema Robotik an.<\/p><p>Aufgrund der regionalen und inhaltlichen N\u00e4he war es f\u00fcr die Advanced Space Power Equipment GmbH eine Selbstverst\u00e4ndlichkeit und ein Herzensanliegen diese erfolgreiche AG als Sponsor zu unterst\u00fctzen.<\/p><p>Bei der 4. RoboCup Junior EM 2023 waren nun die beiden Teams der AG die \u201eBodenseepythons\u201c und die \u201eBodenseegiraffen\u201c sehr erfolgreich und konnten sich jeweils den EM-Titel in der Kategorie \u201eSoccer Lightweight Entry\u201c bzw. \u201eSoccer Open\u201c sichern.<\/p><p>Wir gratulieren den Teams ganz herzliche und freuen uns auf eine weitere Zusammenarbeit im Rahmen von Praktika und Ferienarbeiten!<\/p><p>Hier finden Sie unsere aktuelle Stellenangebote: #BePartofASP<br \/><a href=\"https:\/\/www.asp-equipment.de\/karriere\/\">https:\/\/www.asp-equipment.de\/karriere\/<\/a><\/p><p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>","_et_gb_content_width":"","footnotes":""},"categories":[77],"tags":[],"class_list":["post-987521578","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asp-news-en"],"_links":{"self":[{"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/posts\/987521578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/comments?post=987521578"}],"version-history":[{"count":3,"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/posts\/987521578\/revisions"}],"predecessor-version":[{"id":987521585,"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/posts\/987521578\/revisions\/987521585"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/media\/987521580"}],"wp:attachment":[{"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/media?parent=987521578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/categories?post=987521578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.asp-equipment.de\/en\/wp-json\/wp\/v2\/tags?post=987521578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}