ASP-NEWS🚀🌑 The Artemis II moon mission has successfully launched – with technology from ASP Equipment on board2. April 2026

Did you know when the last human was on the Moon? That’s right: 1972.

Through NASA’s Artemis program, humans are set to return to the Moon in the coming years. Last night (00:35 a.m. CEST), an important milestone of the Artemis II mission was successfully reached. 

ASP technology is on board:
Our two star tracker converters supply power to our customer Jena-Optronik’s star sensor.
The star sensor is a camera that measures the orientation of specific stars relative to a satellite’s current position. Therefore, the star tracker is crucial for alignment with the Sun as well as for orbital corrections.

ℹ️ In the current Artemis II mission, the Moon is being orbited by a crewed space capsule to prepare for humanity’s return to the lunar surface. On board are four astronauts. We congratulate on this outstanding success!

Did you know? In Greek mythology, Artemis is the goddess of the Moon and the twin sister of Apollo. Artemis therefore also symbolically represents the next generation of lunar missions.

 

(Image source: Image by Susana Cipriano on Pixabay)

ILA 2022: ASP presents the SPICA-virtus PPU.

German EnMAP satellite with „Instrument Power Unit“ from ASP successfully launched on 1. April 2022

Between June 22 and June 26, 2022, ASP-Equipment will be exhibiting at ILA Berlin.

ASP-Equipment presents on Space Tech Expo 2021 “High End Power Electronic, ready for lift off”

Our PPU for constellations takes another hurdle

ASP-Equipment GmbH on Space Tech Expo Europe 2021

ASP delivers the Engineering Modell (EM) for Ancillary Electronic Units for ESAs PLATO Mission

ASP Equipment delivers the EQM of the Power Supply Unit (PSU) for Kompsat 7 (K7)

Reiner Strobel now Managing Director of ASP-Equipment

ASP Equipment delivers PFM of the EnMAP IPU

ASP-Equipment contributes to PLATO science mission

ASP hands over its facility enlargement to operative business

No results found.