ASP-NEWSGalileo Mission: ASP demonstrates expertise2. April 2025

Galileo Mission: ASP Equipment GmbH demonstrates expertise in the development of Power Supply Systems for Space Applications

With the delivery of the Proto-Flight Model of the Centralized Power Supply Unit (CPSU) for the 2nd Generation of the Galileo Mission (European satellite navigation) of the European Space Agency (ESA), ASP has once again demonstrated its expertise in the development and manufacturing of Power Supply Systems for space applications.

Major milestones were achieved throughout this development:
• September 2021: Requirements Review
• July 2022: Preliminary Design Review
• December 2022: Delivery of the Elegant Breadboard
• November 2023: Critical Design Review
• August 2024: Delivery of the Engineering Qualification Model
• February 2025: Delivery of the Proto-Flight Model

Now that the CPSU has been successfully qualified, the production phase for 5 Flight Models has already begun. We are excited to continue supporting the Galileo Mission with additional CPSU Flight Models.

500th High-Performance Amplifier (HPA) delivered

PLATO Project: Another Successful Milestone

Mass Change Project: Next Milestone successfully achieved

ASP signs Mass Change contract

ASP celebrates anniversary: “S´bäscht isch jet tu kamm!”

ASP Supports Successful Robotics AG (BZM High School)

400th Star Tracker Converter shipped

EBB of the CPSU for Galileo 2nd Generation delivered

PDR for the Galileo CPSU successfully completed

ASP presents at the ISD2022

ASP as exhibitor at the ISD 2022

ASP delivers RAFS EPC for Galileo

No results found.