ASP-NEWSGalileo Mission: ASP demonstrates expertise2. April 2025

Galileo Mission: ASP Equipment GmbH demonstrates expertise in the development of Power Supply Systems for Space Applications

With the delivery of the Proto-Flight Model of the Centralized Power Supply Unit (CPSU) for the 2nd Generation of the Galileo Mission (European satellite navigation) of the European Space Agency (ESA), ASP has once again demonstrated its expertise in the development and manufacturing of Power Supply Systems for space applications.

Major milestones were achieved throughout this development:
• September 2021: Requirements Review
• July 2022: Preliminary Design Review
• December 2022: Delivery of the Elegant Breadboard
• November 2023: Critical Design Review
• August 2024: Delivery of the Engineering Qualification Model
• February 2025: Delivery of the Proto-Flight Model

Now that the CPSU has been successfully qualified, the production phase for 5 Flight Models has already begun. We are excited to continue supporting the Galileo Mission with additional CPSU Flight Models.

ASP-Equipment expands its headquarter

2nd SMD manufacturing line successfully qualified on 27.07.2017

Member of „Bundestag“ Lothar Riebsamen visits ASP-Equipment

EnMap SHPDU successfully delivered to OHB-System

ASP wins contract for ESAs JUICE-mission

ASP-Equipment elected as board member of AKRK

New ESA SMT line verification status

Visit of Brigitte Zypries in new ASP-facilites

New ASP facilities

The ASP ITAR-free 12W COTS-Converter

ASP successfully delivers four High Voltage Power Supplies for Astro-H Mission

No results found.